CNC Machining for Parts from 5 mm to 100 mm
Small Machine Parts include appliance shafts and connectors, precision gears for printers and copiers, metal fittings for locks and stationery, model and toy components, and internal structural parts for consumer electronics. Yuyao Shizhong Hardware Factory produces components ranging from 5 mm to 100 mm using CNC turning-milling machines and Swiss-type lathes. Machining accuracy is IT6–IT8 for applicable features, depending on part geometry and requirements.
Machining Features and Surface Finishes
Knurling, grooving, and eccentric features can be machined as part of the main process, reducing the need for separate operations on suitable designs. Thin-wall sections can also be produced where the drawing and material allow. Available materials include aluminum alloy, brass, carbon steel, and stainless steel. Surface treatments include anodizing, zinc plating, and nickel plating, selected according to the material and end-use requirements.
Prototype and Batch Production
Orders range from prototype runs to batches of hundreds or tens of thousands of pieces. Prototype lead time is typically 3–5 days, subject to drawing review, material availability, and part complexity. Available operations include CNC turning, milling, drilling, tapping, and knurling. Process selection depends on the component geometry, tolerance requirements, and order volume.
Inspection and Quality Records
Incoming material inspection, first-article inspection, in-process checks, and final inspection cover dimensions, material, surface condition, and specified performance requirements. CMMs, micrometers, surface roughness testers, and hardness testers are available for inspection. Critical dimensions and appearance points are checked 100% where specified, while other batch inspections follow AQL sampling plans. SGS inspection services and RoHS-related documentation can be provided on request, where applicable.
Warranty, Repeat Orders, and Delivery
Small Machine Parts are covered by a 12-month warranty under normal use, subject to the agreed order terms. Damage caused by improper installation, misuse, or normal wear is excluded where applicable. If goods arrive damaged, the issue is assessed using photos and shipping documents. Confirmed packaging or manufacturing defects can be addressed through rework or replacement according to the agreed terms. For transport damage, supporting documents can be provided for a claim with the carrier.
For repeat orders, approved drawings and existing tooling can be reused when the specifications remain unchanged. Any changes to dimensions, materials, or surface treatments are reviewed before production.
Standard parts typically ship within 10–15 working days after the deposit is received. Non-standard parts generally require 20–35 working days after drawing and sample approval. Complex parts and projects requiring new tooling are scheduled separately. Standard packaging consists of an inner carton and an outer carton, with export packaging customized to order requirements. Available trade terms include FOB, CIF, and EXW.
Product Specifications
|
Parameter |
Specification |
|
Part size |
5–100 mm |
|
Machining accuracy |
IT6–IT8, for applicable features |
|
Processing |
CNC turning-milling, Swiss-type machining |
|
Materials |
Aluminum alloy, brass, carbon steel, stainless steel |
|
Prototype lead time |
3–5 days, subject to part complexity and material availability |
|
Batch quantity |
Hundreds to tens of thousands of pieces, depending on the part |
Hot Tags: small machine parts, China small machine parts manufacturers, suppliers, factory
